Tenant billing list
The following fees will be charged, if the tenant has damaged or mishandled the apartment. The billing list is corresponding to the average costs.
Keys and locks |
|
Rekeying the locks (including keys) | 275 € |
Exec-, Easy-, Sento- tai Protec-key | 30 € |
Pulse-keys | 55 € |
Keytag | 30 € |
Car parking key | 15 € |
Easy-, Exec-, Protec-, ja Sento-paddlelock | 130 € |
Pulse-paddlelock | 270 € |
Cleaning |
|
Cleaning charge by hour | 40 € |
Furniture/installed appliances |
|
Laundry basket | 50 € |
Mattress pad | 100 € |
Bed | 300 € |
Bathroom mirror | 120 € |
Apartment repair work |
|
Room door replacement (frame separate) | 100 € |
Other repair work by separate invoicing. | |
All renovation costs caused by indoor smoking will be charged from the tenant in full. | |
HPAC-devices |
|
Radiator thermostat (without the frame) | 70 € |
Toilet seat | 500 € |
Toilet water tank | 250 € |
Basin or sink | 220 € |
Dishwasher plug installment | 40 € |
Dishwasher plug in | 40 € |
Dishwasher installment (incl. fixture installation, tenant provides framing) | 80 € |
Washing machine plug in | 25 € |
Light switch/socket and lamp cover | 50 € |
Replacing a fuse (incl. fuse) | 40 € |
Changing of a bulb (incl. light bulb) | 40 € |
Unnecessary check of digibox/aerial/ WLAN connection (issue with tenants equipment) | 70 € |
Unplugging a drain | 40 € |
Appliances |
|
Fridge with freezebox | 250 € |
Fridge/freezer como/fridge or freezer | 550 € |
Stove | 400 € |
Dishwasher | 450 € |
Charges by the hour |
|
Maintenances charge by hour 8AM-4PM | 40 € |
Maintenances charge by hour outside working hours | 60 € |
Door opening by maintenance |
|
Weekdays 8AM-4PM | 20 € |
Other times and weekday holidays | 40 € |
Invoice fee | 10 € |
Tenants excess to be compensated in damage (year=y) |
|||
Carpeting | <5 y. 100% | 5-15 y. 60% | >15 y. 30% |
Refrigeration devices | <3 y. 100% | 3-8 y. 60% | >8y. 30% |
Bathroom appliances | 10 y. 100% | 10-20 y. 60% | >20 y. 30% |
Painting of walls | <2 y. 100% | 2-5 y. 60% | >5 y. 0% |
(according to the age of the product) | |||
Other labour and required equipment charged by the hour with separate invoicing. Joensuun Elli reserves the right to price adjustments. |
Valid from November 1st 2023.